doc: release process: update milestone definition
Update milestone definitions to reflect current state of the release process. Signed-off-by: Anas Nashif <anas.nashif@intel.com>
This commit is contained in:
parent
92c285e038
commit
80f6a3adbc
Binary file not shown.
Before Width: | Height: | Size: 17 KiB |
4
doc/project/lts.svg
generated
Normal file
4
doc/project/lts.svg
generated
Normal file
File diff suppressed because one or more lines are too long
After Width: | Height: | Size: 12 KiB |
Binary file not shown.
Before Width: | Height: | Size: 36 KiB |
4
doc/project/release_cycle.svg
generated
Normal file
4
doc/project/release_cycle.svg
generated
Normal file
File diff suppressed because one or more lines are too long
After Width: | Height: | Size: 17 KiB |
|
@ -37,7 +37,7 @@ The Zephyr release model was loosely based on the Linux kernel model:
|
|||
- If it is a go for a release, the release owner lays a tag release vN at the
|
||||
same point
|
||||
|
||||
.. figure:: release_cycle.png
|
||||
.. figure:: release_cycle.svg
|
||||
:align: center
|
||||
:alt: Release Cycle
|
||||
:figclass: align-center
|
||||
|
@ -104,6 +104,53 @@ gate the final release. The following counts shall be used:
|
|||
for release 2.4.0, 100 for release 2.5.0, and 50 for release 2.6.0
|
||||
|
||||
|
||||
|
||||
Release Milestones
|
||||
*******************
|
||||
|
||||
|
||||
.. list-table:: Release Milestones
|
||||
:widths: 15 25 100 25
|
||||
:header-rows: 1
|
||||
|
||||
* - Timeline
|
||||
- Checkpoint
|
||||
- Description
|
||||
- Owner
|
||||
* - T-5M
|
||||
- Planning
|
||||
- Finalize dates for release, Assign release owner and agree on project wide goals for this release.
|
||||
- TSC
|
||||
* - T-7W
|
||||
- Review target milestones
|
||||
- Finalize target milestones for features in flight.
|
||||
- Release Engineering
|
||||
* - T-4W
|
||||
- Release Announcement
|
||||
- Release owner announces feature freeze and timeline for release.
|
||||
- Release Manager
|
||||
* - T-3W
|
||||
- Feature Freeze (RC1)
|
||||
- No new features, ONLY stabilization and cosmetic changes, bug and doc fixes are allowed.
|
||||
- Release Engineering
|
||||
* - T-2W
|
||||
- 2nd Release Candidate
|
||||
- No new features, ONLY stabilization and cosmetic changes, bug and doc fixes are allowed.
|
||||
- Release Manager
|
||||
* - T-1W
|
||||
- Hard Freeze (RC3)
|
||||
- Only blocker bug fixes, documentation and changes to release notes are allowed.
|
||||
Release notes need to be complete by this checkpoint. Release Criteria is
|
||||
met.
|
||||
- Release Manager
|
||||
* - T-0W
|
||||
- Release
|
||||
-
|
||||
- Release Manager
|
||||
|
||||
|
||||
|
||||
|
||||
Releases
|
||||
*********
|
||||
|
||||
|
@ -235,7 +282,7 @@ independently from the main tree for at least 2.5 years after it was
|
|||
released. Support and maintenance for an LTS release stops at least half a year
|
||||
after the following LTS release is published.
|
||||
|
||||
.. figure:: lts.png
|
||||
.. figure:: lts.svg
|
||||
:align: center
|
||||
:alt: Long Term Support Release
|
||||
:figclass: align-center
|
||||
|
@ -275,47 +322,6 @@ Release Procedure
|
|||
This section documents the Release manager responsibilities so that it serves as
|
||||
a knowledge repository for Release managers.
|
||||
|
||||
Milestones
|
||||
==========
|
||||
|
||||
The following graphic shows the timeline of phases and milestones associated
|
||||
with each release:
|
||||
|
||||
.. figure:: milestones.jpg
|
||||
:align: center
|
||||
:alt: Release Milestones
|
||||
:figclass: align-center
|
||||
:width: 80%
|
||||
|
||||
Release milestones
|
||||
|
||||
This shows how the phases and milestones of one release overlap with those of
|
||||
the next release:
|
||||
|
||||
|
||||
.. figure:: milestones2.jpg
|
||||
:align: center
|
||||
:alt: Release Milestones
|
||||
:figclass: align-center
|
||||
:width: 80%
|
||||
|
||||
Release milestones with planning
|
||||
|
||||
|
||||
.. csv-table:: Milestone Description
|
||||
:header: "Milestone", "Description", "Definition"
|
||||
:widths: auto
|
||||
|
||||
|
||||
"P0","Planning Kickoff","Start Entering Requirements"
|
||||
"P1","","TSC Agrees on Major Features and Schedule"
|
||||
"M0","Merge Window Open","All features, Sized, and AssignedMerge Window Is Opened"
|
||||
"M1","M1 Checkpoint","Major Features Ready for Code Reviews |br| Test Plans Reviewed and Approved"
|
||||
"M2","Feature Merge Window Close","Feature Freeze |br| Feature Development Complete (including Code Reviews and Unit Tests Passing) |br| P1 Stories Implemented |br| Feature Merge Window Is Closed |br| Test Development Complete |br| Technical Documentation Created/Updated and Ready for Review |br| CCB Control Starts"
|
||||
"M3","Code Freeze","Code Freeze |br| RC3 Tagged and Built"
|
||||
"M4","Release","TSC Reviews the Release Criteria Report and Approves Release
|
||||
|br| Final RC Tagged |br| Make the Release"
|
||||
|
||||
Release Checklist
|
||||
=================
|
||||
|
||||
|
|